国产亚洲美女在线视频

  • <rt id="e8yq4"><source id="e8yq4"></source></rt>

    project

    PRODUCTS SERVICE & SPARE PARTS PROJECTS ABOUT TRUEMAX CONTACT US
    Home >  project >  Concrete Machinery >  DOHA METRO-GREEN LINE
    project

    DOHA METRO-GREEN LINE

    Adding time: 2019.08.30

    Share
    Concrete Placing Boom in Malaysia

    Project Description:

    Total construction mileage 300km include 100 stations, which has both underground lines and elevated lines

    The project’s D&B contract of the Green line underground project has been given to a JV led by PORR Bau, Saudi Bin Laden Group and Hamad Bin Khalid Contracting.


    Truemax Solutions:

    Total concrete equipments solution and accessory. Included the mixer, mold, gantry crane, pumping, placing, galvanize steel walk way etc.    


    Job Site: Qatar


    国产亚洲美女在线视频
  • <rt id="e8yq4"><source id="e8yq4"></source></rt>